Rockdale NSW 2216 - RB833
Project Type
Photography
Date
April 2023
In this project, we assisted the Builder, Kevin with:
✅We Lodged the Demolition Applications with Council on his behalf (and notify surrounding properties of the proposed demolition and development)and after this was done, we further assisting with the demolition stage
✅Engaged and Coordinated the owner-builder’s subcontractors throughout the project
✅Assisted the Builder to obtain the Sydney Water Sewer Service Diagram
✅Excavated the land to match the desired Reduced Level (RL) of the approved plans
✅Assisted and coordinated the excavator for the footing and/or piers; by marking out landmarks and preparing the site for excavation.
✅Rectified the footing and slab steelwork errors made by subcontractor engaged by owner, which resulted in a non-compliance result issued by the private certifier and the concrete pour could proceed
✅Rectified the footing and slab errors made by subcontractor, resulting in non-compliance result issued by the private certifier
✅Assisted the builder to rectify formwork to achieve the new construction to be within the approved boundary lines and Finished Floor Level (FFL) to ensure compliance with stamped plans
✅Addressed the owner's concerns relating to the Finished Floor Level (FFL) and how his concreter might not complete the pour correctly, which would lead to non-compliance with the Australian Building Standards. This was done by coordinating with the concreting team and guiding them during the concrete pour.
✅Supervised the builder during the setup for the full brick and block works to go up with the walls - preventing errors and any rectification in the future
✅Assisted with the correct measurements according to plans for the full brick walls to avoid future errors (as this can cause non-compliance issues due to other stages completing causing the new construction area to either to be increased or decreased to what is stated on plans)
✅Next floor of the build - assisted in the preparation of the first floor build to avoid future errors of not building within surveying boundary lines
✅Our team were present during the inspections that were conducted at each stage, as established by the private certifier